浑水入渗作用下尾矿坝稳定性数值模拟研究[EB/OL]
北京:中国科技论文在线
为探索浑水入渗对尾矿坝稳定性的影响情况
采用FLAC3D有限差分软件对不同浸润线高度的尾矿坝稳定性进行数值模拟分析和计算
当浸润线出渗点达到二级子坝坝中时
2、 辽宁工程技术大学矿业学院
using FLAC3D software for different saturation line height of tailings dam stability analysis and numerical simulation calculation
The results show that when the seepage line of permeability in primary dam Angle, the model of the maximum displacement occurs in the location of the contact with the surface of the water, dry beach with increasing saturation line, the influence of pore water pressure is gradually obvious, when the saturation line out infiltration point reaches the secondary ZiBa dam, located in tertiary ZiBa displacement of dam crest into the position of the maximum
The research results can provide guidance for design and construction of tailings dam and afford positive and instructive use for reference to other tailings dams
Late research results for the tailings dam design and construction and operation of tailings dam provides the theory basis for maintenance
Keywords: mining engineering; muddy water infiltration
4、 辽宁工程技术大学土木与交通学院
( 1、 辽宁工程技术大学力学与工程学院
【详情见下载】